Architectural Design Management
Coordination of all disciplines from concept design to construction drawings, design quality management and permit follow-up.

Decisions taken during design determine a building’s cost and usability throughout its life cycle. Leed Proje architectural design management is a coordination service that steers the design process around client needs, budget and buildability.
We manage architectural, structural, mechanical and electrical design teams under one programme, resolving clashes before they reach the site and delivering buildable, economical and aesthetic projects.
Scope of Service
- Brief and design criteria development
- Concept and schematic design management
- Construction and detail drawings coordination
- Interdisciplinary coordination: Architecture–structure–MEP clash checks
- Buildability and value engineering reviews
- Material and system selection: Façade, insulation and interior solutions
- Permits and approvals: Follow-up with municipalities and authorities
- Tender documents: Technical specifications, estimates and bills of quantities
- Concept stores and interior design projects
Sustainability in Design
By introducing green building principles — energy efficiency, daylighting, water saving and the right materials — early in design, we develop projects that lower operating costs and reduce environmental impact.
Why Leed Proje?
- Over 25 years of field experience: Expertise built on the client side of industrial, residential, commercial and infrastructure projects.
- More than 50 completed projects: Work delivered in Türkiye as well as in Morocco and Egypt.
- Single point of responsibility: Design, tendering, construction and handover coordinated by one team.
- Transparent reporting: Cost, schedule and quality indicators shared with the client in regular reports.
Frequently Asked Questions
We work with our own architect — do we still need this service?
Yes. Design management does not replace the architect; it coordinates the architect’s and other disciplines’ work on behalf of the client in terms of budget, schedule and buildability.
Do you also handle permit processes?
Yes. Project approvals, building permits and other official permissions are within our scope.
From concept to turnkey,
we are with you at every step.
Get in touch with our team to discuss your project needs and build a tailored roadmap.
Talk